Google Translate

Plantronics ADAPTER ASSEMBLY W/ FOOTSWITCH BTO NO RETURNS LONG LEAD TIME 92779-01

Plantronics ADAPTER ASSEMBLY W/ FOOTSWITCH BTO NO RETURNS LONG LEAD TIME 92779-01
Brand: Plantronics, Inc
Part Number: 92779-01
MSRP: $296.99
Availability: 10 or more
Condition: New
Price: $246.79
Qty:     - OR -   Add to Wish List
Add to Compare
ADAPTER ASSEMBLY W/ FOOTSWITCH BTO NO RETURNS LONG LEAD TIME

ADAPTER ASSEMBLY W/ FOOTSWITCH

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad           Good

Enter the code in the box below:



Partschase.com © 2025